Trescott Water Supply Co. Lands

Trescott Water Supply Co. Lands

Hanover, NH – 2018

Assessment of current recreational trails and conceptual design of new trail opportunities on lands managed by the Trescott Water Supply Co. Sinuosity and the town of Hanover co-hosted a series of community forums to gather trail user input and identify priorities for new trail additions.

Continue Reading →

Town of Weare

Town of Weare

Weare, NH – 2018

Assessment of current opportunities for recreation on 7 of the Weare Town Forests. Conceptual designs for expansion, where appropriate as well as probable cost and maintenance/management recommendations.

Continue Reading →

Belleayre Mountain / Shandaken Trails

Belleayre Mountain / Shandaken Trails

Highmount, NY – 2017

Conceptual design and mapping of 17 miles of new mountain bike trails, 18 miles of new XC ski trails, and assessment of 20 miles of existing trails to plan a year-round multi-use trail network for the State of New York in partnership with our friend Eddie Walsh of Tahawus Trails.

Continue Reading →

Stratton Mountain

Stratton Mountain

Winhall, VT – 2017

Design for construction of a complete downhill bike park serving a diversity of mountain bike rider abilities and interests. Trails designed range from family oriented machine built, to advanced trails featuring jumps and rugged natural terrain.

Continue Reading →

Vermont Technical College

Vermont Technical College

Randolph, VT – 2016-17

Conceptual Design of a trail system to provide multi-use recreational opportunities to students, faculty and public on the VTC campus.

Continue Reading →

Owl’s Nest Golf Resort

Owl’s Nest Golf Resort

Thornton, NH – 2016

Phased plan and design of a network of multi-use trails to accommodate a variety of non-motorized trail users at a diversity of skill levels. Design included both identifying and highlighting natural features to showcase with the trail system.

Continue Reading →

Sumggler’s Notch Resort

Sumggler’s Notch Resort

Jeffersonville, VT – 2016

Design of phased expansion to the existing cross country mountain bike trail system at Smuggs.

Continue Reading →

Cranmore Ski Area

Cranmore Ski Area

North Conway, NH – 2015

Conceptual design and plan for family oriented, lift serviced mountain bike trails. We planned 4 years of construction phases with a range of trail types from gentle Beginner flow trails to Expert jump trails.

Continue Reading →

Little River State Park

Little River State Park

Waterbury, VT – 2015

Design and construction planning for 2 miles of new purpose built mountain bike trails in Little River State Park. Our work involved numerous meetings with VT Forest Parks and Recreation and other partners to balance the goals of multiple trail user groups and the land managers.

Continue Reading →

Waitsfield Scrag Forest

Waitsfield Scrag Forest

Waitsfield, VT – November 2014

Sinuosity completed the Waitsfield Scrag Forest Trail Design and Construction Plan for the Town of Waitsfield, under the guidance and request of the Waitsfield Conservation Commission. The plan consists of recommendations for mitigation of existing erosion on the existing trail, as well as new trail design to access other areas of interest within the property boundaries.  The resulting trail design and layout was intently guided and informed by the in depth and comprehensive Forest Management Plan for the ...

Continue Reading →

Moody Park Trail Maintenance Management Plan

Moody Park Trail Maintenance Management Plan

Claremont, NH – November 2014

Our team systematically assessed the trails within Moody Park and reported the existing conditions, required maintenance, potential for improvement, and our recommendations for changes in trail layout, design, and usage to better suit a variety of user groups. We identified, classified, and categorized existing trails, identify vulnerable areas, and suggested improvements to maximize the sustainability of the trails.

We worked closely with the City of Claremont Parks and Recreation representatives to organize our approach in a way that ...

Continue Reading →

St. Albans Recreation Reserve

St. Albans Recreation Reserve

St. Albans, VT – August 2014

The St. Albans Recreation Reserve Trail Sustainability and Management Plan (Hard’ack and Aldis Hill trails) was prepared at the request of Friends of Northern Lake Champlain on behalf of the St. Albans Recreation Reserve Steering Committee and in cooperation with Franklin Mountain Bike Club (local VMBA chapter), Hard’ack Inc., and St. Albans City School. The project consisted of an inventory and assessment of current trail conditions (according to USFS Trail Class Matrix) and subsequent recommendations ...

Continue Reading →

Killington Trail Planning and Design

Killington Trail Planning and Design

Killington, VT – October 2013 to December 2014

Sinuosity is developing the conceptual design and layout for of a 15 mile trail network for the Town of Killington.  We have designed and flagged 6 miles of the the proposed trail network.  Our work has involved multiple additional partners including the US Forest Service, Vermont State Parks, VMBA, and private landowners.

Continue Reading →

Arms Park Trail Maintenance Plan

Arms Park Trail Maintenance Plan

Burlington, VT – June 2013

Sinuosity completed a comprehensive plan for the 4 mile multi-use trail network on the Arms Park property for the City of Burlington in 2013. The plan consisted of a complete inventory and assessment of existing trail conditions (according to USFS Trail Class Matrix) and improvements to bring all trail sections up to a safe and sustainable standard. Recommendations were given to increase sustainability and durability of trail surfaces, minimize user conflict, and create a variety of trail ...

Continue Reading →